家有三个媳妇陈淑蓉婆媳关系解析, 性色欲网站人妻丰满中文久久不卡, 免费无码成人Av片在线在线播放, 没有我的允许你一滴也别想尿出来,日韩丝袜在线观看视频,手机在线观看福利视频,大地高清第一页,亚洲一区二区自拍全程记录,天堂素人搭讪系列95在线播放

中文
Projects
Bangladesh Dhaka-Asulia Elevated Expressway Project

The project is located in Dhaka, the capital of Bangladesh, is designed and constructed according to American Standard and Bangladesh Standard, and adopts EPC general contracting, with the contract amount of USD 1,359 million and the construction period of five years. The main body of the project is a 24km two-way four-lane viaduct, 14.28km ground road reconstruction, and comprehensive supporting projects such as housing construction and electromechanical engineering. The project is a cooperative project between the governments of China and Bangladesh. It is a fruitful achievement of the “Belt and Road Initiative”, with great social influence and political significance.


Back

Main Work Undertaken

JSTI is responsible for design consultation, construction supervision and project management.

 

Innovation Points 

(1) Study the differences between Chinese and foreign norms and standards in depth, improve business capacity and level, provide quality services, enhance corporate image, and establish corporate brand.

(2) Adhere to pay equal attention to both economic and social benefits, do a good job in environmental protection to promote local employment, select and train local staff, create localization and reduce costs.

(3) China and Bangladesh jointly promote the project to build “Golden Bangladesh” and increase the happiness index of the local people.